Photos: Alexis del Toro
The unit two of the Lidio Ramón Pérez thermoelectric power plant, located in the municipality of Mayarí, in Holguín, was synchronized with the National Electroenergetic System (SEN) on Thursday afternoon, after five days of maintenance.
Read more Holguín: Thermic power plant synchronizes with the national electric power systemThe Oral Narration Company Palabras al Viento premiered on Saturday the play "Wasi, the ghost of the piano" as a demonstration of creative skill on the stage and a moment of delight for the public who attended the Eddy Sunol Theater, in Holguín.
Read more “Wasi, the Phantom of the Piano” premiered in HolguínPage 220 of 470